THE
CORRECTION OF PROJECT AND COMPLETION OF CONSTRUCTION
The original project has been changed and
extended in the assortment of products and in the capacity of technological lines. The new
project decision has been made:
1. In the tomato shop:
- To assemble a line for tomato paste packaging into
barrel 200kg
- To organize tomato juice “hot” bottling.
- Make a secondary water use system to save water at the
preliminary tomato wash line.
- It is planned to buy foreign equipment for aseptic
tomato packaging into barrel .
2. In the fruit- vegetable canning shop:
- To buy a green peas processing line and equipment for
preliminary sugar corn processing.
- Equipment to fry vegetables for caviar processing.
- To buy six more drying machines to the shop.
As the result the capacity of
the factory increases from 7,5 million bottles up to 20 million bottles a year.
|