THE CORRECTION OF PROJECT AND COMPLETION OF CONSTRUCTION

The original project has been changed and extended in the assortment of products and in the capacity of technological lines. The new project decision has been made:

1. In the tomato shop:

  • To assemble a line for tomato paste packaging into barrel 200kg
  • To organize tomato juice “hot” bottling.
  • Make a secondary water use system to save water at the preliminary tomato wash line.
  • It is planned to buy foreign equipment for aseptic tomato packaging into barrel .

2. In the fruit- vegetable canning shop:

  • To buy a green peas processing line and equipment for preliminary sugar corn processing.
  • Equipment to fry vegetables for caviar processing.
  • To buy six more drying machines to the shop.

As the result the capacity of the factory increases from 7,5 million bottles up to 20 million bottles a year.

 

 

 

 

 

 

 