THE FACTORY DRAFT BUILDING PROJECT

The construction of next complexes was intended:

1. Fruit and vegetable canning shop draft project (capacity – 3 millions bottles a year) including:

  • Fruit – vegetable canning shop;
  • Product warehouse;
  • Material storehouse;
  • Storehouse for clean bottles;
  • Gatekeeper’s office with security-fire alarm system room;
  • Transformer station;
  • Water-supply system with two reservoirs and a pump station;
  • Preliminary sewage filter system;
  • Rain drainage system;
  • Pump station main sewage system;

2. Tomato paste shop draft project (capacity – 4,5 million bottles a year) including:

  • Tomato paste canning shop;
  • Products warehouse;
  • Circulating water supply system;
  • Cooling tower;
  • Administrative building;
  • Metalworking and mechanical shop with autoclave service;
  • Canteen for 50 people;

3. Boiler room,  sewage system draft project:

It was intended to build a boiler room with four tanks to heat the shops. It was also supposed to connect the water supply system to the city water supply system through two accumulating reservoirs and the pump station. Sewage system: everyday household and industrial sewage through the preliminary sewage filter to the main sewage system and then to the city sewage system. The transformer station with two 400 kVt electricity transformers was planed to supply electricity. The telephone connection is through the city telephone station.

The overall factory capacity is supposed to be 8,4 million bottles a year.

The area of the factory is 7,2 hectares.

The number of workers in two shops is 215 people, the overall number is 300 people.

During the harvest season the work schedule is intended to have two shifts a day. In the tomato shop – 3 shifts a day.

 

 

 

 

 

 

 